Radiant Floor - Photos


Boilers - Furnaces - Space Heaters - Radiant Floor - Baseboard - Services Offered - Facts - Essays- Cost Per BTU - Emissions - Tune-Up Time - Choosing Boilers - Work Photos


(For slower connections this page may take long to load due to it's large amount of images.)


PHOTOS of SOME of OUR RADIANT FLOOR JOBS

 

Bright Day (poor photo) 3000sq. ft. home, Slab Construction, with Frost Walls, Tubing Stapled to Foam.

Tubing Stapled to sub floor, wood frame floor, awaiting concrete over pour.

                                    

New Home, Monolithic Slab, with Tubing wire tied to Steel reinforcing mesh. Direct Vent boiler to heat the slab.

Elevated Slab Tubing tied to Reinforcing Wire.

                         

Snow Melt in Sidewalk at our old Shop.

5,00sq.ft. Snow Melt Job @ M.D.I. Hospital Entrance

3 Miles of Tubing

First coat of asphalt was laid by hand. Cold water was run through tubing during paving. Asphalt had to be monitored closely to assure it's temp was low so it would not melt tubing. 

Only the perimeter was insulated. The earth was used as a heat sink, to store energy to compensate for sudden temp drops.

               

Bob's Masterpiece.